Up to top level
AO15   AO16   AO17   AO18   AO19   Backgrounds   Calibration   Conference   Data   Docs   EPICMOS   EPICpn   Feedback   Gallery   Misc   OM   Pending   PhD_Theses   Publications   RGS   RadMonitor   SAS_Hardware   SAS_WS   SASv16.0   SASv16.0_Installation   SASv16.1   SASv16.1_Installation   SASv17.0   SASv17.0_Installation   SASv18.0   SASv18.0_Installation   SciSim   Simulators_other   Suggestions   Trash   Visibility   XMM-bouncing   XMM-news   XRPS   XSA   esas   incoming  

Logged in as guest

Viewing Data/8212
Full headers

From: Jerome bouvier <Jerome.Bouvier@obs.ujf-grenoble.fr>
Subject: Pipe-line reduction of Prop. 015268
Compose reply
Download message
Move To:
1 replies: 1
0 followups:

Private message: yes  no

Notes:

Notification:


From: Jerome bouvier  <Jerome.Bouvier@obs.ujf-grenoble.fr>
Date: Mon, 10 Mar 2003 10:18:22 +0100 (NFT)
To: xmmhelp@xmm.vilspa.esa.es
Subject: Pipe-line reduction of Prop. 015268
Dear XMM Helpdesk,

I have checked on XMM web pages that the observations of Prop 015268 of
which i am PI have been completed. I would very much like to include the
results of this project in the invited talk i have to give at the
conference ``Current Issues in Star Formation'' in Brazil early April
(http://www.astro.iag.usp.br/~ystars/).  Could you tell me when i can hope
to receive the CDs with all reduced data (there are 8 exposures obtained
during Rev 583-590) ?

Best regards,
Jerome

-- 
                             
    Jerome BOUVIER       
    Laboratoire d'Astrophysique   
    Observatoire de Grenoble
    Universite Joseph Fourier - B.P.53  
    F-38041 Grenoble Cedex 9 

	e-mail: jbouvier@laog.obs.ujf-grenoble.fr
	tel: (33) 04 76 51 47 90
        fax: (33) 04 76 44 88 21



Reply 1

Resend
From: Michel G. Breitfellner <xmmhelp@xmm.vilspa.esa.es>
To: Jerome.Bouvier@obs.ujf-grenoble.fr
Subject: Re: Pipe-line reduction of Prop. 015268 (PR#8212)
Date: Tue Mar 11 11:01:11 2003
Dear Dr. Bouvier,

As you can see from our web page about
"XMM-Newton Observation & Data Processing Status"
http://xmm.vilspa.esa.es/external/xmm_obs_info/obs_stat_log.shtml
your observations are currently processed by the pipeline.
If there is no problem this takes about two to three weeks.

Eventually you will get some, but not all data on time for your
conference early April.

With best regards,
Michel G. Breitfellner
XMM-Newton User Support Group

Up to top level
AO15   AO16   AO17   AO18   AO19   Backgrounds   Calibration   Conference   Data   Docs   EPICMOS   EPICpn   Feedback   Gallery   Misc   OM   Pending   PhD_Theses   Publications   RGS   RadMonitor   SAS_Hardware   SAS_WS   SASv16.0   SASv16.0_Installation   SASv16.1   SASv16.1_Installation   SASv17.0   SASv17.0_Installation   SASv18.0   SASv18.0_Installation   SciSim   Simulators_other   Suggestions   Trash   Visibility   XMM-bouncing   XMM-news   XRPS   XSA   esas   incoming  

Logged in as guest


Please make your (short) question the subject of your request!


Web interface using JitterBug ... back to the XMM home page